Fabrication & Installation of Ammonium Nitrate Silos

Lumwana Mine

Project Background

Barrick Lumwana Mine required a compliant and durable storage solution for Ammonium Nitrate (AN), a critical explosive material used in mining operations. The goal was to upgrade and strengthen the material storage infrastructure to meet stringent safety and operational standards.
Lynx Supply and Services Limited was engaged to execute the design review, fabrication, delivery, and installation of high-strength Ammonium Nitrate silos, leveraging our experience in heavy fabrication and mining infrastructure solutions.

Project Objectives

End-to-End Project Execution

Scope of Work

The project scope included detailed engineering review, heavy fabrication, controlled logistics, and crane-assisted installation in line with mining and explosive-handling standards.

Engineering & Design Review

  • Verification of client’s technical requirements
  • Preparation and approval of detailed fabrication drawings
  • Selection of structural steel and corrosion-resistant coating systems
  • Compliance with mining and explosive material standards

Fabrication at Lynx Workshop

  • CNC cutting, rolling, and forming of silo shells
  • Precision welding conducted by certified welders
  • NDT inspection of critical joints
  • Surface preparation and protective coating
  • Pre-assembly and fit-up inspection before dispatch

Logistics & Delivery

  • Oversized cargo route planning and permits
  • Heavy-duty support frames for safe transportation
  • Coordinated dispatch to Lumwana Mine

On-Site Installation

  • Crane-assisted erection and rigging
  • Base alignment, anchoring, and structural securing
  • Installation of platforms, ladders, and safety handrails
  • Connection to client’s material handling systems
  • Final inspection & commissioning

Challenges

Solutions

Measured Outcomes and Lasting Impact

Results, Achievements and Project Significance

This project delivered measurable operational results while reinforcing Lynx Supply and Services Limited’s capability to execute complex, safety-critical mining infrastructure projects with precision, compliance, and reliability.

Results & Achievements

  • Project delivered on time and within budget
  • Zero safety incidents throughout the project cycle
  • Enhanced AN storage capacity and operational safety
  • Improved reliability and compliance for the mine
  • Seamless collaboration with Barrick engineering teams

Project Significance

  • Heavy industrial fabrication
  • Explosive-material storage engineering
  • Strict QA/QC compliance
  • Delivering complex projects in demanding mining environments

Key Project Metrics

MetricValue
Number of Silos4 Units + Structural Steel
MaterialStructural Steel with Protective Coating
DeliverablesFabrication, Delivery & Installation
Safety ComplianceMining Safety & Ammonium Nitrate (AN) Handling Standards